Camera Breakout (SC-02)

Presentations

Wednesday 1:30-5:00 pm

System Integration and verification    1:30-2:30 pm
Camera Integration and Test (I&T)    2:30-3:30 pm (updated 8/2)
Data Acquisition (DAQ)    3:45-4:15 pm
Camer Control System (CCS)   4:15-4:45 pm

Backup Slides
Filter Exchange System
Camera Body and Shutter
Optics
Utility Trunk

Data Requests

Camera Responsed to 2nd Day Questions (added 8/8)
Camera Responses to 1st Day Questions (added 8/7)
Commissioning Execution Plan (LSE-390) (added 8/6)
Camera Science Raft Channel Loss Mitigation Plan (added 8/6)
Report for Raft Channel Loss Review (added 8/6)

Reference Documents

RECENT REVIEWS
DOE CD-3 Review (Aug 4-6, 2015) Report | Response
DOE CD-3 ICE Review (please post) Report | Response

RECENT DOE MIE MONTHLY REPORTS
June 2019
May 2019
April 2019

RECENT DOE COMMISSIONING REPORTS
June 2019 DOE Report
May 2019 DOE Report
April 2019 DOE Report

POLICIES, PROCEDURES & SPECIFICATIONS
Acquisition Strategy (LCA-10883)  
Project Execution Plan
Integrated Project Team (IPT) Charter

Project Management Plan (PMP) LCA-226
WBS Dictionary LCA-125
Risk Management Plan (RMP) LCA-29
Risk Registry LCA-30

Project Control Plan (PCP) LCA-228
System Engineering Management Plan (SEMP) LCA-38
Hazard Analysis Report LCA-14
Hazard List LCA-15
Configuration Management Plan LCA-39
Value Engineering Plan LCA-141
Design Review Plan LCA-98
Contamination Control Plan LCA-279
ESD Plan LCA-10032
Grounding and Shielding Plan LCA-278
Operation Concept Plan LCA-282

Quality Implementation Plan LCA-227
PSAP LCA-138
Hardware Protection Plan LCA-139
Hardware Protection Protocol List LCA-140
Safety Management Plan LCA-31
Camera Loads Specification LCA-68
Camera Environmental Specification Supporting Analyses LCA-69
Mechanical Standards LCA-280
Factors of Safety LCA-10031

Electronics Standards LCA-10098
Software Standards LCA-10099
Camera Subsystem Requirements LSE-59
Camera Specification LCA-48
Integration and Test Plan LCA-40
Camera Verification Test Plan LCA-283
Camera Final Design Report LCA-11591
Camera Descope Plan LCA-276
Memo for Record on Acceptance of non-conformance ITL Sensors LPM-262
Memo from LSST Camera Project Office, Sensor non-conformance agreement LCA-16456
Camera Image quality tree LCA-17
Camera Tolerance Stackup LCA-10147
Camera Throughput Budget LCA-18
Camera Overage Plan LCA-398

Zircon - This is a contributing Drupal Theme
Design by WeebPal.