Updates

Work Cafeteria Area | Trabajos Area de Comedor

2017 Jun 6 - 2:45pm
  • From June 7 to 13 excavations will be done by the lateral access to the cafeteria 

  • This work won't affect the entry area to the cafeteria, however we recommend avoiding passing through the area

  • Prefer entering the cafeteria through the library 

  • If this is not possible, respect de safety demarcation installed onsite and use the walkway to enter the cafeteria 

 


  • Desde el 7 de junio al 13 de junio se realizaran trabajos de excavación frente al ingreso lateral al comedor 

Work in Warehouse Area Begins on Monday | Trabajos en el Area de la Bodega Comienzan el Lunes

2017 May 31 - 2:15pm

From Monday, June 5th the warehouse area will be delimited due to disassembly and demolition work beginning on Thursday June 8th. For this reason, on Friday June 2nd, cones will be placed in the parking areas that will be blocked for the installation of the safety enclosure which will take place on Monday.

Some considerations to be aware of:

Power Cut on Saturday, May 20 | Corte de Energía este Sabado, 20 de Mayo

2017 May 17 - 8:15am

There will be a power cut on Saturday, May 20 from 8:30am with its restoration at 5pm. We ask that necessary precautions are taken in order to avoid inconveniences.

The affected areas are:

1.- Annex A Building (both floors)

     Administration

     Electronic Lab, Optical Lab

     ETS (Offices over the Electronic Lab)

     CISS

2.- Garage

3.- Warehouse

4.- Motel

5.- Modulux

6.- Casa Verde

Pages

Webcam