From Monday, June 5th the warehouse area will be delimited due to disassembly and demolition work beginning on Thursday June 8th. For this reason, on Friday June 2nd, cones will be placed in the parking areas that will be blocked for the installation of the safety enclosure which will take place on Monday.

Some considerations to be aware of:

  • Respect the signage and warning cones installed in the safety enclosure with warning tape
  • Avoid parking vehicles in unauthorized areas
  • Do not walk through the enclosed area
  • Respect the traffic flow in order to avoid inconveniences

Desde el Lunes 5 de Junio el área de la Bodega será delimitada, debido a que los trabajos de desarme y demolición comenzaran el día Jueves de esa semana. Por este motivo, el Viernes 2 de Junio después de la jornada laboral, se colocaran conos en los estacionamientos que quedaran inhabilitados para proceder con la instalación del cierre a primera hora del día Lunes.

Algunas consideraciones que se deben tener son:

  • Respete la señalética y conos de advertencia instalados en el perímetro de seguridad establecido con cinta de advertencia
  • Evite estacionar vehículos en áreas no habilitadas
  • No transite por el área delimitada, debido a que se llevaran a cabo tareas que conllevan proyección de partículas y polvo en el área
  • Respete el flujo de transito dispuesto según la gráfica para evitar inconvenientes de traslado en el Recinto 

Cierre Bodega