Plan for the week of November 7 | Plan para la semana del 7 de Noviembre

2016 Nov 4 - 10:45am

Monday November 07

·       Demarcation of the place with cones and warning tape.

·       Pruning of small shrubs in the woods area.

·       Enabling access for the entry of trucks and machinery that will allow the removal of material.

Tuesday November 08

·       Demarcation to prevent access to the parking area because of work carried out in this area.

·       Entry of boom truck to start the pruning at height of larger trees.

·       Entry of machinery (backhoe) to start the chopping of trees.

Preparation for Construction | Preparacion para la Construccion

2016 Oct 28 - 10:15am

In preparation for the construction work of the AURA-LSST-NOAO Base Facility Addition in the recinto, the enabling of 23 parking spaces will soon begin at the interior of the woods between reception and house 6.

The first phase consists of cutting trees and bushes of different sizes in the interior of the woods, access perimeter and in front of reception.  This operation will take approximately 10 business days.

Did you know...?

2016 Oct 27 - 1:30pm

For parking area enabling, clearing and tree cutting will be done. All of this work will be signaled to avoid damage. Pay attention to the signage in the work area and don’t trespass signaled or blocked areas. These warnings and measures have been designed for your own safety.

Did You Know ...?

2016 Oct 26 - 2:00pm

The parking spots designed to be used during the Base Facility construction will have wheel boundaries in order to ensure organized and safe parking.

¿Sabías que…….?

En los sitios de estacionamiento diseñados para ser usados durante la construcción del Base Facility se delimitaran por medio de topes para ruedas de manera tal de asegurar un estacionamiento ordenado y seguro.

Did you know …?

2016 Oct 24 - 1:15pm

During the construction of the Base Facility there will be a parking area set up with 23 spots. It will be located in front of reception. This parking area has been created in order to ensure that everyone has a safe and comfortable place to park our vehicles.


¿Sabías que………?

Durante la construcción del Base Facility se habilitara un sector con 23 estacionamientos, estos se ubicaran frente a la recepción del edificio de Aura. Este sitio de estacionamiento ha sido creado para asegurar que todos tengamos un lugar seguro y cómodo para estacionar nuestros vehículos.