Access 1 works / Trabajos en el acceso 1
• Tomorrow, Wednesday, September 12, material loading works will be carried out in the sector indicated in the picture (in front of warehouse)
• This activity will take place between 2:00 p.m. and 6:00 p.m.
• The works consider the use of one of the traffic lanes for the cargo truck and intermittently the use of both routes for loading with a forklift crane.
• Staff will be available to control traffic.
• It will be appreciated that Drivers follow the directions of the signallers in the area.
• Parking spaces will be available in front of Instruments Shop .
__________________________________________________________________________________________________________________________________
• Mañana miércoles 12 de septiembre se realizarán trabajos de carga de materiales en el sector que se indica en la gráfica (frente a Bodega)
• Esta actividad se realizar entre las 14:00 y las 18:00 horas
• Los trabajos consideran el uso de una de las vías de circulación para el camión de carga y en forma intermitente el uso de ambas vías para carga con grúa horquilla
• Se dispondrá personal para controlar el tránsito
• Se agradecerá a los conductores seguir las indicaciones de los señaleros dispuestos en el área.
• Se dispondrá de espacios de estacionamiento frente a Instruments Shop.