Pallets lift in La Serena Recinto | Izaje de Pallets en La Serena Recinto

Wednesday, 18 April 2018 - 10:30am

- On Thursday, April 19th at 10:00 [am] a lift  will be carry out from outside of the Warehouse to Computer Room, all this maneuver will take around 30 minutes.

- This lift will be carried out by Crane Tower of Construction Site, so, the route will be closed for 30 minutes from 9:50 am until 10:20 am.

- Vehicles and pedestrians have to avoid the area detailed in the graph since the maneuvers will include suspended cargo.

- In the same way, it is requested to avoid the cargo area (warehouse front) and download area (computer room) while the lift is carry out.

 


- Este Jueves 19 de Abril  a las 10:00 [am] se realizara un izaje de cargas de IT desde frontis de Bodega a Sala de Computadores , toda esta maniobra tomara alrededor de 30 minutos

 Este izaje sere realizará con Torre Grúa de Construcción por tanto la ruta que será cerrada por 30 minutas a contar de las 9:50 hasta las 10:20 am

- Se solicita a vehículos y peatones no acercarse al área detallada en la gráfica en la cual las maniobras incluirán carga suspendida

- De la misma manera se solicita se abstengan de acceder a las área de carga (frontis de Bodega)  y descarga (sala de computadores) mientras dure el Izaje.